Baltimore Formstone sheds alkaline cement runoff onto rowhouse glass, Inner Harbor windows take salt aerosol, and water runs 76 to 120 mg/L hard.
Baltimore's reservoir water is moderately hard, so spots stay light, but Formstone fronts shed alkaline cement runoff onto rowhouse glass and Inner Harbor windows collect salt. June and August to November are the best months for exterior work. Rowhouses with no setback put most upper-floor glass on a pole or rigging, so access sets the price; a single-story exterior runs $300 to $550.

The Department of Public Works' laboratory mineral analyses put Baltimore's water at 76 to 120 mg/L, moderately hard: enough to leave light spots on sunlit glass that dries on its own, not enough to etch it. The supply is Piedmont reservoir surface water, and what the Formstone and the harbour air put on the glass matters more to the result than the tap.
Figures by plant, as reported.
| Hardness | 76–120 mg/L as CaCO₃ 2022 monthly results: 76 to 84 mg/L at the Ashburton plant (average 80) and 109 to 120 at the Montebello plants (average 114); moderately hard on the USGS ladder, as published by Baltimore City Department of Public Works. |
|---|---|
| pH | 7.55–8.07 |
| Alkalinity | 41–68 mg/L as CaCO₃ |
| Iron | 0–0.02 mg/L |
| Manganese | 0–0.01 mg/L |
| Sodium | 19.7–20.9 mg/L |
| Chloride | 43–58 mg/L |
| Disinfectant | free chlorine |
| Source and treatment | Surface water, per the EPA SDWIS federal record · Permanganate for taste and odour, pre pH adjustment, coagulation, flocculation, sedimentation and rapid sand filtration, pre and post chlorination, fluoridation and post pH adjustment for corrosion control · No softening step. |
Not in the report: corrosion index and total dissolved solids.
SOURCE · Baltimore City DPW 2022 Mineral Analyses forms (Ashburton and Montebello laboratories, latest posted) and 2025 Water Quality Report, PWSID MD0300002, with the EPA SDWIS federal treatment record · How we source these numbers
Formstone is the loading that belongs to this city and nowhere else. The cement-stone facade applied to rowhouses between about 1930 and 1960 sheds a fine grey cementitious runoff onto lower-floor glass whenever it rains, and it is mildly alkaline — so it dulls rather than merely dirties, and it returns on the weather rather than on a cleaning interval.
MARYLAND SEASON BY SEASON →Baltimore DPW draws Loch Raven and Liberty Reservoir on Piedmont terrain; its laboratory forms put hardness at 76 to 84 mg/L from Ashburton and 109 to 120 from Montebello. Maryland splits three ways by source and no figure crosses between them. Formstone facade runoff is the city's signature loading and exists nowhere else on this site: mildly alkaline, it dulls glass rather than dirtying it. Rowhouse geometry removes ladder setback and makes access, not area, the cost.
Baltimore DPW draws Loch Raven and Liberty Reservoir surface water on Piedmont terrain, and its laboratories publish monthly hardness averaging about 80 mg/L from the Ashburton plant and 114 from the Montebello plants. Piedmont reservoir supply has closed soft against its operators elsewhere in the mid-Atlantic and the Carolinas.
Maryland may not publish the row at all. The department's hardness figures appear in its yearly mineral-analyses forms for each laboratory rather than in the annual report.
Maryland is a three-way split by source. Baltimore takes Piedmont reservoirs, Waldorf takes Coastal Plain groundwater, and the WSSC corridor around Silver Spring takes the Potomac. Three different waters in one small state, and no figure should be carried between them.
Formstone is a Baltimore-specific problem and it has no equivalent anywhere else on this site. The cement-stone facade applied to rowhouses between roughly 1930 and 1960 sheds a fine grey cementitious runoff onto lower-floor glass in heavy rain, and because it is mildly alkaline it dulls the surface rather than simply dirtying it.
Rowhouse geometry removes the setback a ladder needs. Flat fronts sit directly on the pavement, so upper-floor glass is pole work or rigged work rather than ladder work, and narrow streets make parking time a real cost between jobs.
Federal Hill, Canton, Fells Point and Mount Vernon carry pre-1900 rowhouse stock with original wavy glass in its first sash. That glass is not flat, a scraper finds the high spots first, and the damage does not polish out.
Access rather than glass area sets the residential day. Rowhouse frontages with no setback mean pole work or street-level rigging on most upper storeys, and parking on narrow streets consumes time between jobs. The Inner Harbor and downtown towers are a separate commercial book with rigging and building-management scheduling on their own rate.
Rowhouse geometry makes this harder than it looks. Flat fronts directly on the pavement leave no setback for a ladder, upper floors are reached from the street or not at all, and the pre-1900 stock through Federal Hill, Canton, Fells Point and Mount Vernon carries original wavy glass that will not tolerate a scraper. Formstone runoff is the other specialist problem, because it needs neutralising rather than scrubbing.
OPEN COST ESTIMATOR →2025 annual mean at the Lake Montebello monitor, 3900 Hillen Road, 4.6 km north-east of the city (EPA site 24-510-5253).
Largest air release: Grace Davison-Curtis BAY Works, 5500 Chemical RD (chemicals), inside the city limits, 25,391 lb in 2024.
Baltimore's Director of Public Works can order the use of water suspended, conditioned or limited whenever supply requires it, and the order may single out pavement washing along with lawn sprinkling and car washing; breaking such an order is itself an offense under the water article, as is connecting to a fire hydrant to use water without a DPW permit.
Baltimore City Code Art. 24 §1-6: director's power over water uses · Baltimore City Code Art. 24 §21-6: hydrant tampering and illegal use of water · checked September 2026
Baltimore's sewer article bars putting organic, chemical or other pollutants into any storm drain where they would harm the quality of the water the drain empties into, alongside oils that leave a film and acids or alkalies strong enough to damage the system; detergent-laden rinse water from a commercial job falls on the wrong side of that line.
Baltimore City Code Art. 25 §2-6: prohibited discharges into storm drains · checked September 2026
In Baltimore, any structure inside a Historical and Architectural Preservation District or Conservation District, or on the exterior landmark list, needs a CHAP-reviewed building permit before any exterior architectural feature is altered or removed; only repair that changes nothing in design, material, color or appearance is exempt, so sash or glazing that looks different goes to the commission.
Baltimore City Code Art. 6 §8-2: permit required for exterior alterations · Baltimore City Code Art. 6 §8-15: permissible maintenance and repair · checked September 2026
Cement-and-aggregate facade coating applied 1940s-1970s across Baltimore rowhouse stock leaches mineral runoff onto windows below the facade. Baltimore-only pattern. Requires extended citric dwell (3-4 minutes) and gentle agitation, never scraped. Worst on south-facing exposures.
Wet-only handling. Peak early-to-mid April. Pollen lifts cleanly with water plus light alkaline soap; do not scrape. Annapolis tidal-basin cherry-blossom adjacent properties hit hardest.
The Department of Public Works' laboratory mineral analyses put Baltimore's water at 76 to 120 mg/L, moderately hard: enough to leave light spots on sunlit glass that dries on its own, not enough to etch it. The supply is Piedmont reservoir surface water, and what the Formstone and the harbour air put on the glass matters more to the result than the tap.
Residential window cleaning in Baltimore typically runs $10–16 per pane or $300–550 for a standard single-story exterior. Access rather than glass area sets the residential day. Rowhouse frontages with no setback mean pole work or street-level rigging on most upper storeys, and parking on narrow streets consumes time between jobs.
Baltimore's drier, frost-free months are June and August to November, by NOAA's 1991–2020 normals for the Md Science Center Baltimore station, where July brings the most rain. The calendar on this page marks June (after the April 14 bloom), September (after smoke season) and November (before frost). Frost nights usually run from November 21 to March 24.
Yes, if the rinse is squeegeed off before it dries: Baltimore City Department of Public Works publishes hardness of 76–120 mg/L, between this site's two dissolved-solids flags. Iron, manganese, sodium and chloride all sit under this site's flags (highest: chloride up to 58 mg/L). Treatment starts with permanganate for taste, odour, pre pH adjustment and coagulation.
In Baltimore the dominant residue patterns include alkaline cementitious runoff from formstone rowhouse facades and harbour salt aerosol on waterfront and inner harbor glass. Formstone is the loading that belongs to this city and nowhere else.
Rowhouse geometry makes this harder than it looks. Flat fronts directly on the pavement leave no setback for a ladder, upper floors are reached from the street or not at all, and the pre-1900 stock through Federal Hill, Canton, Fells Point and Mount Vernon carries original wavy glass that will not tolerate a scraper.
Pre-1900 rowhouse heritage residential with substantial original glazing and formstone-facade exposure. Mount Vernon and Canton have their own housing stock and glazing as well.
Just over the Maryland line